Google search engine
Home News Airline News FAA Identifies Router Failure as Cause of November 13 National Ground Stop

FAA Identifies Router Failure as Cause of November 13 National Ground Stop

FAA Ends O’Hare Ground Stop After Radar Outage, Delays Persist
Image: Airplane runway by Unknown creator via rawpixel, cc0

A newly installed router at a remote FAA radio site in El Dorado, Arkansas, overwhelmed the national air traffic control system with excess data on November 13, 2026, triggering a nationwide ground stop that canceled 12,000 flights, according to investigators who recreated the failure in a laboratory setting. The problem arose from a router configuration setting that was overlooked and affected interaction with older routers still in use by the FAA. Investigation teams, including the FBI and national security representatives, are 90% confident the disruption was not caused by malicious actors and are preparing a report while planning software patches

to prevent recurrence.

FAA Oversight and Maintenance Coordination Reductions

The maintenance that involved replacing the aged router was performed by L3Harris, the contractor responsible for the FAA Telecommunications Infrastructure, on the day of the outage. The work scheduling and coordination for such upgrades is now handled by only four FAA liaison employees nationwide, a reduction from at least six FAA employees involved previously. These liaisons coordinate but do not approve maintenance activities, a change implemented under the Trump administration to accelerate system modernization by removing FAA approval layers.

Union Criticism on Reduced FAA Oversight

David Spero, president of the Professional Aviation Safety Specialists union, strongly criticized the downsizing of FAA coordination staff,

stating, “It’s not reasonable to have four people coordinating telecommunications maintenance and outages for the entire national air space system.” He emphasized the excessive workload on these liaisons, noting they are working massive amounts of overtime. The union also raised concerns that the elimination of FAA approval during maintenance prevents risk mitigation and appropriate timing decisions for work execution.

Historical Context: 2009 Router Misconfiguration Outage

This event echoes a similar breakdown on November 19, 2009, when a Harris Corp. technician misconfigured an FAA router at the Los Angeles Center, blocking about 75% of the FAA telecommunications network for five hours. That outage caused widespread flight delays

and cancellations affecting 129 air traffic facilities nationally. The Department of Transportation inspector general at the time sharply criticized FAA’s contractor oversight, recommending improvements to prevent unscheduled outages and improve service reliability.

FAA Statements and Impact of the November 13 Outage

The FAA defended its current oversight procedures, stating it conducts continuous risk assessments and monitors contractor performance but does not directly supervise contractor fieldwork or certify internal router configurations. FAA personnel still must approve maintenance done by agency technicians, in contrast to private contractors like L3Harris. The FAA emphasizes that post-incident, software updates will be implemented to prevent similar failures.

The November 13 ground stop affected the entire

U.S. air traffic control system, prompting the temporary suspension of all flights nationwide and causing 12,000 cancellations. This outage is regarded as the most severe U.S. air travel disruption since the September 11, 2001 attacks.

Congressional Scrutiny and Modernization Efforts

FAA Administrator Bryan Bedford and U.S. Transportation Secretary Sean Duffy are scheduled to testify before Congress regarding the incident as the agency works to modernize the national air traffic control system. The Trump administration has requested an additional $50 billion from Congress to accelerate system upgrades and address vulnerabilities highlighted by the router failure. CNN reports that system modernization funding and oversight reforms remain key

points of congressional debate.