East Midlands Railway (EMR) is scheduled to transfer to public ownership by the end of 2027. The UK’s Department for Transport (DfT) has instructed EMR to take immediate measures to improve service reliability before the renationalisation takes place.
Aurora Fleet Problems Cause Delays, Strikes
Service disruptions on EMR began due to issues with the new Aurora (Class 810) trains manufactured by Hitachi Rail. These problems caused months of delays, cancellations, and overcrowding on routes connecting London St Pancras with the East Midlands. The RMT union representing EMR staff announced strike action in July 2026 amid these challenges. The EMR managing director also resigned in the wake
of these ongoing issues.
Timetable Reductions and Recovery Schedules
In July 2026, EMR’s Intercity timetable was temporarily cut to 87% of its planned operations due to maintenance and reliability problems with the Aurora fleet. Service levels improved to 92% by 1 September 2026, with plans to raise operations to 96% starting 19 October 2026. The contract core term for EMR expires on 18 October 2026, allowing the government to begin the transfer of the operator into public ownership without penalty.
Great British Railways Aims to End Fragmentation
The renationalisation of EMR forms part of a broader government strategy to integrate all Department for Transport rail contracts under the newly formed Great British
Railways. The initiative seeks to reverse three decades of fragmentation and inefficiency in the rail sector. The public ownership transition is projected to save £150 million annually by eliminating payments to private operators. Other services, such as Great Anglia and South Western Railway, have already been nationalised, while Avanti West Coast is scheduled for renationalisation in March 2027.
Diverse Reactions from Officials and Stakeholders
The DfT emphasized the need for EMR to resolve its operational issues swiftly to reduce passenger disruption. An official statement said the government aims to “build towards Great British Railways, which will undo 30 years of inefficiency and fragmentation to put passengers
back at the heart of services.” Steve Jones, East Midlands branch secretary for Railfuture, expressed hope that renationalisation would improve network coordination benefiting passengers and freight. Conversely, Neil O’Brien, Conservative MP for Harborough, Oadby and Wigston, criticized public ownership as insufficient to address EMR’s operational difficulties. Labour MP James Naish of Rushcliffe criticized repeated contract extensions with struggling private operators, saying this did not incentivize improvements.
EMR’s Current Operational Status and Uncertainties
EMR has stated that the Department for Transport has not formally confirmed the exact date for the transfer into public ownership. The operator attributed timetable reductions to a three-year delay in the delivery of
the Aurora trains and ongoing performance issues with both the Class 810 and existing Class 222 fleets maintained by Hitachi Rail. EMR has apologized for the disruptions caused and is working with Hitachi Rail and the DfT to restore full service levels as soon as possible.











