Google search engine
Home News Destination News Second Tunnel Breakthrough in Mumbai-Ahmedabad Bullet Train Project

Second Tunnel Breakthrough in Mumbai-Ahmedabad Bullet Train Project

Second Tunnel Breakthrough in Mumbai-Ahmedabad Bullet Train Project
Image: Knapsack Gully Viaduct by Blue Mountains Library, Local Studies via flickr, by-sa

The Mumbai-Ahmedabad bullet train project has advanced with the completion of its second mountain tunnel breakthrough in Palghar. This marks another key phase in the development of the high-speed rail corridor connecting Mumbai to Ahmedabad.

Construction activity for the bullet train project remains underway as of May 2026, reflecting steady progress in building the extensive rail infrastructure required for the future operation of this line. The work in Palghar is an integral part of the ongoing efforts to establish a modern rapid transit link between these important Indian cities.