On November 16, 2026, flights heading to Austin-Bergstrom International Airport are experiencing average delays of 65 minutes caused by ongoing runway and taxiway construction at the Texas airport, the Federal Aviation Administration (FAA) reported.
FAA Implements Ground-Delay Program to Manage Construction Impact
The FAA has activated a ground-delay program for flights bound for Austin on November 16. This program controls departure times at origin airports to manage reduced arrival capacity at Austin-Bergstrom resulting from the construction. Instead of holding aircraft in the air, flights may remain on the ground at their departure points before takeoff.
These measures aim to prevent aerial congestion near Austin by metering inbound traffic,
with delays showing as departure holds rather than airborne holding patterns.
Passenger Impact and Official Guidance
Passengers traveling through Austin-Bergstrom International Airport should anticipate longer wait times due to the construction-related delays. The FAA advises travelers to consult their airlines for the latest updates on specific flights, as the 65-minute average delay is an estimate subject to change throughout the day.
Effects on Airline Operations and Air Traffic
The construction-driven ground-delay program shifts delay costs to departure airports and airline schedules, affecting aircraft rotations, crew duty times, and downstream connections beyond Austin. This delay management applies to all flights routed to Austin, including commercial airlines as well as general aviation and business
aircraft sharing arrival flows.
This ground-delay strategy contrasts with disruptions caused by weather or equipment failures, as it is a planned response to capacity constraints due to airport infrastructure work.








