Carnival Corporation has signed a contract valued at over €2 billion ($2.2 billion) with Italian shipbuilder Fincantieri to construct two next-generation cruise ships. These vessels, designed to be primarily powered by liquefied natural gas (LNG), will be built at Fincantieri’s Marghera shipyard in Italy. Deliveries are scheduled for 2033 and 2035.
Each ship will measure approximately 130,000 gross tons and feature around 1,650 passenger cabins. This new class of ships is smaller compared to Carnival’s recent large-scale vessels, offering enhanced operational flexibility allowing access to ports inaccessible to the company’s largest ships.
Fleet Composition and Operational Flexibility
The two new ships mark a departure from
Carnival’s current focus on very large cruise ships. Carnival’s recent Ace-class ships, currently under construction at Fincantieri’s Monfalcone shipyard, are around 230,000 gross tons with nearly 8,000 passenger capacity each. Those three Ace-class vessels are expected for delivery in 2029, 2031, and 2033. The new LNG-powered ships will be roughly 43% smaller by gross tonnage relative to the Ace-class.
Carnival’s existing fleet includes 29 vessels. The new ships will add a smaller, more adaptable class to complement the larger Excel Class ships. This complements the company’s strategy to offer guests a range of ship sizes and experiences.
Official Statements from Carnival Cruise Line Leadership
Carnival Cruise Line
President Christine Duffy emphasized the importance of offering varied vessel sizes. She said, “With a 29-ship fleet, we know our guests appreciate choices. They love the incredible experiences and amenities on our Excel Class ships, the largest in our fleet, but they also love the intimacy our smaller ships offer.”
Carnival Corporation CEO Josh Weinstein noted the corporation has 12 ships on order for delivery through 2039 across the Carnival Cruise Line, Princess Cruises, and AIDA Cruises brands.
Industry Context and Long-Term Partnership with Fincantieri
This vessel order represents a shift within the cruise industry from a trend of building ever-larger ships to introducing smaller, environmentally advanced
ships with greater operational flexibility. The ships are built on a multi-brand platform design, allowing Carnival Corporation to potentially deploy similar vessels across multiple cruise lines.
The contract continues a three-decade relationship between Carnival Corporation and Fincantieri, which has delivered 76 vessels for Carnival’s brands, including 15 for Carnival Cruise Line. Additionally, Carnival is expanding its private destination infrastructure with upcoming phases at Celebration Key on Grand Bahama, set for completion in 2028 and 2030, increasing land-side guest capacity by 6,000.









