Google search engine
Home News Airline News 520 Flights Delayed or Cancelled at Boston Logan on September 28 Amid...

520 Flights Delayed or Cancelled at Boston Logan on September 28 Amid Nor’easter and Construction

400+ Flight Delays and Cancellations at Boston Logan Today
Image: Alaska Airlines Boeing 737 N457AS, taking off, with rainbow, SFO DSC_0468 by wbaiv via flickr, by-sa

On Monday, September 28, 2026, Boston Logan International Airport experienced 520 flight delays and cancellations as the Federal Aviation Administration (FAA) enforced a ground delay from 7:30 a.m. on September 28 to 2:59 a.m. on September 29.

Nor’easter Weather and Runway Work Cause Disruptions

The disruptions were caused by a combination of lingering nor’easter weather and ongoing runway and taxiway construction at Logan International Airport. The nor’easter storm recently dumped between 3 and more than 7 inches of rain in southern New England, contributing to operational difficulties.

Wind speeds on September 28 forced aircraft to use alternative runways because a runway normally in use was closed for

construction. According to Massport spokeswoman Jennifer Mehigan, this shift reduced efficiency in air traffic control operations.

Inbound Flights Face Extended Delays

Inbound flights arriving at Logan faced delays averaging five hours and 14 minutes. The FAA imposed the ground delay from 7:30 a.m. on Monday, September 28 to 2:59 a.m. Tuesday, September 29 in response to the combined effects of weather and construction.

Massport officials emphasized that the alternative runway usage slowed traffic flow, affecting scheduling and flight sequencing.

Southern New England Impact and Traveler Advisory

Southern New England experienced the residual effects of the nor’easter, combining heavy rainfall with Logan’s reduced runway capacity to cause widespread flight disruptions on September 28.

Massport urged travelers to check flight status with their airlines and stay updated before traveling to Logan International Airport.